master
Enable Simulation Runs for 6 inch wafers as well
Try to complete the 6 inch application of HGCal for Test Beam studies
Make the 6-inch geometry working again which could be used for HGCal TB applications
Transfer most of the HGCal TB related geometry file to the new branch Geometry/HGCalTBCommonData
Make a setup like HGCal TB with 47 all silicon layers of detectors (26 for EE and 21 for HE) with some lateral structure
Change directory name 2026 to 2030 to enable future Run3 runs during 2026
Commit changes made by Ashim for 2023 August/Septemeber Test Beam
Add a simulation setup for radiation hardness studies of HGCal wafers
Extra changes
Further update thecodes and XML files for 2025 HGCal TB Studies